Recommended Posts

First and foremost - Great update! Love the added freedom of creativity to place things through power tethers! I like the direction its heading!

Large Rovers / Large Storage [Steam: Post Basebuilding Update]

The large rover has 4 (x2) slots [including the front and back connectors], and a large storage uses up 2 of the (x2) slots [giving you a total of 8 slots free: 4 from the large storage, 1 seat, 1 remaining (x2) on the rover, and the front and back]. Prior to the update, you could power your rover by placing a power source [solar panel/wind turbine/large battery] either on your large storage, or by placing them on the front/back connection points.

Now they wont work.

My assumption is that when the large storage is built upon a rover, it is not "connecting" to the power source via this new method and not in circuit with the rovers battery.

I've also found issues with the large batteries power not being used by the rover, even when directly connected on top of one of its dedicated (x2) slots.

Either way, I believe there to be a bug with the connectivity points on the rover both on top of it, and by "daisy chaining" rovers together, as they dont share power consumption anymore [just as the front/back don't use the power sources connected to them].
 

Edited by WelshWhit
Link to post
Share on other sites

This is a repost, there is already an active topic about it, please try to check at least last 10 topics before posting a new one!

also daisy chained rovers works for me... when the rover in the front runs out of power it starts draining the second one and keep going!

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

×   Your link has been automatically embedded.   Display as a link instead